Identity area
Reference code
Title
Date(s)
- 1899-1900 (Creation)
Level of description
Extent and medium
1 file
Context area
Name of creator
Administrative history
In 1897 the Corporation formally decided to supply the city with electricity. The Electric Lighting Committee recruited the first City Electrical Engineer in 1899 and oversaw the construction of a power station at Foss Islands which opened in 1900.
The Committee was renamed the Electricity Committee in 1904 because other uses of electricity had increased.
Instructed City Electrical Engineer.
Repository
Content and structure area
Scope and content
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Open
Material is available subject to the usual terms and conditions of access to Archives and Local History collections.
Conditions governing reproduction
Images are supplied for private research only at the Archivist's discretion. Please note that material may be unsuitable for copying on conservation grounds. Researchers who wish to publish material must seek copyright permission from the copyright owner.
Language of material
- English