Zone d'identification
Cote
Titre
Date(s)
- 1858-1911 (Création/Production)
Niveau de description
Étendue matérielle et support
1 box
Zone du contexte
Nom du producteur
Histoire administrative
Contracts for the sewerage work were finalised in 1891, and a new engineer, inspector of works and inspector of construction of machinery were appointed. The work was split into multiple contracts, No.1 Pumping Station and Engines, No. 2 City Sewers, No.3 Pumping Station buildings, No. 4 Rising Main and Outfall Works at Naburn and No. 5 Sludge Pressing plant.. The work cost more than expected and application was made to the Local Government Board in 1895 for a extension of the capital expediture loan repayment period.
See also Drainage and Sanitary Improvement Act Committee (1852-1888)
Zone du contenu et de la structure
Portée et contenu
Accruals
System of arrangement
Zone des conditions d'accès et d'utilisation
Conditions d’accès
Open
Material is available subject to the usual terms and conditions of access to Archives and Local History collections.
Conditions governing reproduction
Images are supplied for private research only at the Archivist's discretion. Please note that material may be unsuitable for copying on conservation grounds. Researchers who wish to publish material must seek copyright permission from the copyright owner.
Language of material
- anglais