Identity area
Reference code
Title
Date(s)
- 11 August 1947 - 1950s (Creation)
Level of description
Extent and medium
12 plans
Context area
Name of creator
Name of creator
Name of creator
Name of creator
Name of creator
Repository
Content and structure area
Scope and content
Castle Mill Bridge Reconstruction: Section, half elevation, full size contour of necking to pier, full size section through string course
Architect's coloured conceptual drawing of north elevation
Architects pencil conceptual drawing of the bridge
E.7000 south and north elevation and half section
D/1612/1 plan, elevation, section of pavement slab, approach slab, detail of central reservation
D/1611/1 Cross sections
D/1610/1 Proposed realignment, general plan, longitudinal sections on centre lines
D/982/1 and D/982/2 general plan and elevation of the bridge from south, and sections. - Drawing type: General plan, section, longitudinal section, cross section, elevation, detail drawing, conceptual drawing
Drawing number (if any): D/982/1. D/982/2, D/1610/1, D/1611/1, D/1612/1, E.7000
Scale: Various scales
Size: Large
Names: Chas. J. Minter, City Engineer and Architect
PLEASE REQUEST THIS ITEM ONE WEEK IN ADVANCE - HELD IN OFFSITE STORAGE
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Open
Material is available subject to the usual terms and conditions of access to Archives and Local History collections.
Conditions governing reproduction
Images are supplied for private research only at the Archivist's discretion. Please note that material may be unsuitable for copying on conservation grounds. Researchers who wish to publish material must seek copyright permission from the copyright owner.
Language of material
- English