Identity area
Reference code
Title
Date(s)
- October 1938 - November March 1939 (Creation)
Level of description
Extent and medium
8 plans
Context area
Name of creator
Name of creator
Name of creator
Name of creator
Name of creator
Repository
Content and structure area
Scope and content
Plans show flooring on Span 4, including connection of decking timbers to girders
site alterations to girders, span 4
reinforcement for main girders, span 4
Span no 4 - additional diaphragms and stringers
steelwork over pit span no 4. Also a plan showing strengthening of lift span
plan showing Skeldergate reconstruction of decking to lifting span
and a plan of St. George's Fields with owners and occupiers, includes Skeldergate Bridge. Plans annotated with additional information including notes and modifications. - Drawing type: Detail drawing
section
cross-section
working drawing
Drawing number (if any): 494/38/14A
490/38/10A
490/38/16
490/38/2
490/38/9b
D/2837
14316
Scale: Various
Size: Large
Names: Sir William Arrol and Company Limited, Glasgow, Structural Department
R.S. Bellhouse, City Engineer, Surveyor and Planning Officer
Chas J. Minter, City Engineer and Surveyor, Guildhall, York
PLEASE REQUEST THIS ITEM ONE WEEK IN ADVANCE - HELD IN OFFSITE STORAGE
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Open
Material is available subject to the usual terms and conditions of access to Archives and Local History collections.
Conditions governing reproduction
Images are supplied for private research only at the Archivist's discretion. Please note that material may be unsuitable for copying on conservation grounds. Researchers who wish to publish material must seek copyright permission from the copyright owner.
Language of material
- English