Área de identidad
Código de referencia
Título
Fecha(s)
- 1888-1914 (Creación)
Nivel de descripción
Volumen y soporte
3 volumes
Área de contexto
Nombre del productor
Historia administrativa
Contracts for the sewerage work were finalised in 1891, and a new engineer, inspector of works and inspector of construction of machinery were appointed. The work was split into multiple contracts, No.1 Pumping Station and Engines, No. 2 City Sewers, No.3 Pumping Station buildings, No. 4 Rising Main and Outfall Works at Naburn and No. 5 Sludge Pressing plant.. The work cost more than expected and application was made to the Local Government Board in 1895 for a extension of the capital expediture loan repayment period.
See also Drainage and Sanitary Improvement Act Committee (1852-1888)
Institución archivística
Área de contenido y estructura
Alcance y contenido
The volumes contain indexes
1 1888-94
2 1895-1910
3 1910-1914
Acumulaciones
Sistema de arreglo
Área de condiciones de acceso y uso
Condiciones de acceso
Open
Material is available subject to the usual terms and conditions of access to Archives and Local History collections.
Condiciones
Images are supplied for private research only at the Archivist's discretion. Please note that material may be unsuitable for copying on conservation grounds. Researchers who wish to publish material must seek copyright permission from the copyright owner.
Idioma del material
- inglés