Zona de identificação
Código de referência
Título
Data(s)
- 1888-1914 (Produção)
Nível de descrição
Dimensão e suporte
3 volumes
Zona do contexto
Nome do produtor
História administrativa
Contracts for the sewerage work were finalised in 1891, and a new engineer, inspector of works and inspector of construction of machinery were appointed. The work was split into multiple contracts, No.1 Pumping Station and Engines, No. 2 City Sewers, No.3 Pumping Station buildings, No. 4 Rising Main and Outfall Works at Naburn and No. 5 Sludge Pressing plant.. The work cost more than expected and application was made to the Local Government Board in 1895 for a extension of the capital expediture loan repayment period.
See also Drainage and Sanitary Improvement Act Committee (1852-1888)
Entidade detentora
Zona do conteúdo e estrutura
Âmbito e conteúdo
The volumes contain indexes
1 1888-94
2 1895-1910
3 1910-1914
Incorporações
Sistema de arranjo
Zona de condições de acesso e utilização
Condições de acesso
Open
Material is available subject to the usual terms and conditions of access to Archives and Local History collections.
Condiçoes de reprodução
Images are supplied for private research only at the Archivist's discretion. Please note that material may be unsuitable for copying on conservation grounds. Researchers who wish to publish material must seek copyright permission from the copyright owner.
Idioma do material
- inglês